Dear businee partners ,
Dear businee partners ,
I hope you are doing great.
please find the below requirement with our client and share consultant
resume to ashok.ch@infolob.com
Project Manager
Location: Austin, TX
Duration: 12 Months
Note: Travel will be required to different locations of Client Offices.
Minimum Requirements:
| Years | Skills/Experience |
| 8 | Extensive work experience and understanding of project management life cycle (PMLC) and system development life cycle (SDLC) methodologies. |
| 8 | Experience in identifying potential project risks and issues and documenting strategies to accept, mitigate, or avoid. |
| 8 | Experience in conducting meetings and/or presentation preparation tasks as needed (e.g., prepare or oversee preparation of and provide agendas and pre-meeting materials as well as follow-up notes, post meeting materials, assignment follow-up and related activities). |
| 8 | Experience in MS Office Suite. |
| Strong | Must have strong writing, analytical, interpersonal, organizational, and communications skills with project management experience. |
Preferences:
| Years | Skills/Experience |
| 5 | Experience working in a state/federal government environment |
| 5 | Project Management Professional (PMP) certification. |
Task 1. Work Prioritization:
· Work with PM, SSLC Facilities Director and IT IO Director to prioritize each building within a site based on the number of aggregation points from each building.
· Prioritize each SSLC based on the current risk level.
· Work with the PM, SSLC Facilities Director and IT IO Director to gather required information to include but not limited to:
- Building construction
- Detailed building diagrams containing
§ Size
§ Construction material
§ Room placement
§ Existing cabling
- Facility layout including but not limited to:
§ Building distance
§ Soil composition
§ Existing fiber location
§ Trenching constraints
· install Intrusion Prevention System hardware/software to monitor network and/or system activities for security purposes.
· Develop 3 site packages containing four SSLCs per package. Each package could be aligned but not limited to:
- Geographical location
- Number of high, medium, and low priority sites.
Task 2. Detailed Assessment:
· Identify a representative sample of SSLC sites for the following steps.
- Fiber plant assessment at each of the representative sampling of the SSLC sites.
- Wireless heat map for Signal penetration at each of the representative sampling of the SSLC sites
Task 3. Design and Implementation SOW:
· The written approach should require:
- Participation of a vendor walk-through of the representative sites
· Each approach should include:
- A detailed bill of material,
- fixed price cost for each of the sites within a package.
--
Thanks & Regards,
Ashok CH |
Infolob Solutions Inc.|
|Office: 972-535-5559 Ext 107 |Fax: 888-228-4125 Email: ashok.ch@infolob.com |www.infolob.com |
A MBE COMPANY | ORACLE PLATINUM PARTNER COMPANY
------------------------------------------------------------------------------
You received this message because you are subscribed to the Google Groups "canada usa jobs" group.
To unsubscribe from this group and stop receiving emails from it, send an email to canada-usa-jobs+unsubscribe@googlegroups.com.
For more options, visit https://groups.google.com/groups/opt_out.
No comments:
Post a Comment